City Penthouse

City Penthouse

Job Spec

city-centre-3-500

Bosco undertook an extensive renovation to an existing 3 level penthouse in the City Centre. The job specification was top end and involved stripping the apartment back to a shell and then putting it back together - all at the top of a busy city street.

Work Completed

  • Strip the building back to a shell
  • Re-build all floors ceilings and walls
  • Re-build balconies and balustrades
  • All joinery and glazing including new external doors

Innovation and Problem Solving

In the words of Bosco's Steve Talbot

"The biggest problem on this job was the access - there was one small lift which was in constant use by the residents of  this exclusive apartment block.

Having stripped the apartment down we basically shipped it out through the lobby in sealed buckets to ensure there was no mess or disruption. We worked closely with the neighbours to manage the deliver of materials and parking.

The team showed great innovation when we closed the street on a Sunday to get the crane in place to lift the major elements of the build up to the top floor.

We worked closely with the architect throughout the whole build and despite the fact that the client was overseas for the majority of the project we were able to keep the client up to speed and keep the project on track."

Outcome

The client was delighted with the work process and the final outcome. 